Connect with us

News

LAGOS RED RAIL LINE NOW AT COMPLETION STAGE – SANWO-OLU

Published

on

Lagos State Governor, Babajide Sanwo-Olu
Lagos State Governor Babajide Sanwo-Olu
Share

 

•Governor, again, inspects State-owned metro project

Lagos State Governor Babajide Sanwo-Olu, on Sunday, again went on an extensive inspection of the ongoing construction activities around the Lagos Rail Mass Transit (LRMT) Red Line project.

It’s the fourth time in a year the Governor would be inspecting the pace of work on the 37-kilometre-long rail infrastructure wholly started by his administration, with Sanwo-Olu assuring Lagosians that the rail project would be delivered on its scheduled completion date.

The transport infrastructure being developed by the Lagos Metropolitan Area Transport Authority (LAMATA) will have the capacity to transport over 500,000 passengers daily when it becomes operational in the first quarter of next year.

The Red Line will traverse on standard gauge from Agbado to Oyingbo, in the first phase, while terminating at Iddo in the second phase. It has eight stations and it is expected to reduce travel by over two hours.

Sanwo-Olu, joined on the project tour by the Deputy Governor, Dr. Obafemi Hamzat, and members of cabinet, first stopped at the multi-level Agege Terminal, where he inspected completion work on the facility.

The Agege Red Line terminal shares the same yard with Babatunde Raji Fashola Station built by the Federal Government, but stands about 300 metres apart.

The Governor also inspected the staff quarters built by the Lagos Government for the railway workers in the employment of the Federal Government.

Sanwo-Olu, thereafter, led the team to the iconic Ikeja Station of the Red Line, where 80 per cent of the civil work had been completed. The Governor also checked the progress of the overpass being constructed on Awolowo Way axis to ensure non-interference of vehicular movement on the rail passageway.

The Governor stopped at Mushin terminal, to inspect the station and overpass, which stretches between Kayode and Ogunmokun streets, being developed there, before proceeding to Yaba and Oyingbo stations.

After the exercise that lasted for four hours, Sanwo-Olu expressed satisfaction on the quality of the work done, disclosing that most of the difficult tasks had been completed.

The entire construction, the Governor said, has moved into the finishing phase in which precast beams and other concrete fittings are being coupled to the constructed structures.

He said: “The Red Line is a project conceived and started by our Government, which will be delivered in the lifetime of this administration. We have given our commitment to ensure the project is completed by the end of this year as promised. This is our fourth inspection trip on this project within the year alone and each time we come, there is significant progress that the contractor achieves along the rail corridor.

“Along the rail corridor, there is massive regeneration that is taking place and we have paid extensive amount in terms of compensation, far more than anyone else, for those affected by the construction activities. That is why we don’t have problem with members of the communities on this corridor. After inspecting the Agege station, we went on to check the Ikeja terminal, which happens to be the iconic station of the Red Line. Its size is almost about the size of three football fields together.

“As we have seen, all the stations inspected are at the roof level, moving into the completion stage. The civil work has been completed, it’s just the finishing job we are doing at the moment. All the activities are on schedule and we are hoping the best entire project will be completed by the end of the year. There are places that were particularly challenging for the contractor to do drilling due to high vehicular density. All the challenges have been overcome; what is left is concrete in-situ and placing of precast beams.”

Sanwo-Olu said the construction work on the overpasses were at different stages of completion but assured that all work would be done by December.

He said the work on the bridge on Awolowo Way onto Agege Motor Road and inward Mongoro Bus Stop remained on track and would finish by the end of October.

Sanwo-Olu said the Mushin overpass, which crosses from Kayode Street at Ikorodu Road to Agege Motor Road in Mushin, and the one at Yaba from Tejuosho exiting onto Murtala Muhammed Road, would be completed by November.

To eliminate human interference with the rail corridor, the Governor said the rail passageway would be walled off the residential areas. This, he said, would also prevent encroachment and unapproved commercial activities around the corridor.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

News

Tinubu Accelerates Northern Rail Projects, Kaduna-Kano Line Set for December 3 Inauguration

Published

on

Train station
Share

 

President Bola Ahmed Tinubu has intensified efforts to complete major railway projects across Northern Nigeria, with the Kaduna–Kano Standard Gauge Railway scheduled for inauguration on December 3, 2026.

The 203-kilometre Kaduna–Zaria–Kano railway project has reached approximately 90 per cent completion, while the 400-kilometre Kano–Katsina–Maradi railway project has attained 70 per cent completion.

According to the Federal Government, both projects have recorded significant progress since the Tinubu administration assumed office in 2023. The Kano–Katsina–Maradi project was reportedly at just five per cent completion, while the Kaduna–Kano line was below 30 per cent.

The projects form part of the administration’s commitment to expanding Nigeria’s railway network, improving regional connectivity and facilitating the movement of passengers and goods across the country and beyond.

The Kaduna–Kano railway, an extension of the existing Abuja–Kaduna Standard Gauge Railway, is expected to establish a continuous rail connection between Abuja, Kaduna, Zaria and Kano, strengthening transportation links among key commercial centres in Northern Nigeria.

To assess the level of progress, President Tinubu recently directed a Federal Government inspection team, led by the Permanent Secretary of the Federal Ministry of Transportation, Engr. Funso Adebiyi, to inspect the projects.

Adebiyi expressed satisfaction with the quality of construction work, particularly the railway alignment, drainage systems, embankment protection, stone pitching and soil stabilisation.

The inspection also featured a train test run from Jaji in Kaduna State to Kano, enabling officials to assess the completed track infrastructure and passenger comfort.

President Tinubu has further directed that outstanding land acquisition and compensation issues within Kaduna metropolis be resolved immediately to facilitate the completion of the railway corridor connecting Abuja to Kano.

The Federal Government disclosed that the completed 190-kilometre Jaji–Kano section of the Kaduna–Kano railway, alongside the 250-kilometre Dawanu–Kano–Kazaure–Daura–Katsina section of the Kano–Maradi project, is scheduled for inauguration on December 3, 2026.

When fully operational, the Kaduna–Kano railway is expected to ease passenger movement, boost commercial activities and provide a safer alternative to road transportation along one of Northern Nigeria’s busiest economic corridors.

Similarly, the Kano–Katsina–Maradi railway is expected to enhance cross-border transportation, strengthen regional trade and deepen economic relations between Nigeria and neighbouring Niger Republic.

The Federal Government reiterated its commitment to ensuring that ongoing infrastructure projects across the country are completed and delivered in line with their scheduled timelines.

Continue Reading

News

FG Begins ₦50,000 Monthly Cash Relief for Vulnerable Nigerians

Published

on

Coat of Arms
Share

 

The Federal Government has commenced a monthly cash relief programme offering ₦50,000 to vulnerable Nigerians to cushion the effects of rising living costs and economic hardship.

The Minister of Humanitarian Affairs and Poverty Reduction, Bernard Doro, disclosed this in a statement issued on Friday in Abuja, announcing the National Emergency Relief and Stabilisation Intervention (NERSI), a presidential initiative aimed at providing direct financial support to millions of vulnerable households.

Doro said the intervention was introduced in response to global food inflation and rising prices of essential goods, which continue to put pressure on household finances.

Under the programme, eligible beneficiaries will receive ₦50,000 monthly to help meet essential needs and ease the burden of the rising cost of living.

The minister explained that the intervention would be reviewed periodically in line with prevailing economic conditions, with beneficiaries notified directly before any adjustment.

He said the ministry was working with licensed digital financial service providers to ensure secure, transparent and timely disbursement of the funds.

According to him, beneficiaries will receive text messages from the providers seeking their consent before payments are made directly into their bank accounts or mobile wallets.

Doro clarified that beneficiaries are not required to apply, pay any fee or register through agents to access the programme.

He warned Nigerians against fraudsters, urging them not to disclose their Personal Identification Numbers (PINs) or Bank Verification Numbers (BVNs) to anyone.

The minister advised those uncertain about any message or facing demands for payment to contact the official NERSI helpline on 0700-022-2222.

He said the intervention complements existing Federal Government social protection and economic support programmes, while strengthening household resilience and economic stability.

Doro added that the initiative aligns with President Bola Tinubu’s Renewed Hope Agenda and underscores the ministry’s commitment to delivering social support with dignity, transparency and accountability.

Continue Reading

News

Ekiti Bureau Congratulates Oyebanji, Prioritises Curbing Capital Flight

Published

on

Share

 

 

 

The Ekiti State Bureau of Local Content has congratulated Governor Biodun Oyebanji on his inauguration for a second term in office, pledging to prioritise efforts to address capital flight and strengthen the state’s economy.

The Bureau, in a congratulatory message issued by its management, and signed by the director of Admin Mr Tope Fasoyin, described the governor’s second-term inauguration as an opportunity to consolidate the achievements of his first tenure and advance policies aimed at promoting sustainable economic development in the state.

 

The agency reaffirmed its commitment to supporting the governor’s vision of retaining more economic resources within Ekiti State through effective implementation of local content policies.

 

It said efforts would be intensified to promote the participation of indigenous businesses in government projects, encourage patronage of locally produced goods and services, and create more opportunities for local contractors, suppliers, and service providers.

 

According to the Bureau, prioritising local content would help reduce capital flight, stimulate indigenous enterprise, create employment opportunities, and ensure that more economic benefits accrue to the people of Ekiti State.

 

The management also pledged to collaborate with relevant stakeholders to ensure that the governor’s economic development agenda is translated into tangible benefits for residents.

 

It expressed confidence that Governor Oyebanji’s second term would bring renewed opportunities for economic growth, investment, and sustainable development across the state.

 

The Bureau wished the governor a successful and impactful second term in office.

Continue Reading